JMJ double diaphragm coupling installation details:
JMJ double diaphragm coupling before installation, we need to clean the transmission parts of the coupling, and then wipe the oil on the cleaned parts. For diaphragm couplings ready for operation in a short time, after drying, some turbine oil or oil can be applied to the surface of the parts to prevent rust. For the coupling transmission parts that need to be put into use for a long time, it should be coated with anti-rust oil maintenance. In the installation, it is generally the first two half couplings are installed on the two axes to be connected, and then the host is aligned, and then move, adjust and connect the shaft, and take the host as the benchmark to rotate the shaft to the host. By measuring the change of radial and axial relative positions of the two halves coupling in simultaneous rotation, the judgment is made. In order to give full play to the performance of the coupling, please install in accordance with the specification of the greater tolerance for eccentricity. The installation errors in the table are larger values when they occur independently, so please consider less than half of the allowable values when recombination occurs. When centering, please stick the ruler on the periphery of the body and check it with two points about 90° apart. The service life of components will be greatly affected according to the different core accuracy. After installing the coupling, be sure to add the safety cover. Otherwise, contact with the product during operation may result in injury.Contact: Mr Wang
Phone: 86-19932127135
Tel: 0311-69772900
Email: linda@rongxingcoupling.com
Add: No.58,Zhongshan Road,Shijiazhuang,Hebei, China